RAPAPORT… Botswana Diamonds will begin bulk sampling and diamond
production from its Thorny River project in South Africa in May.
It will then ramp up output to 20,000 tonnes a month, the
company said Monday. The kimberlite ore will be processed at a nearby plant,
which is currently being refurbished.
In the six months ending December 31, the miner reported a
loss of GBP 190,000 ($251,347). It has yet to post any revenue.
Botswana Diamonds has a joint venture with Vast Diamonds in
the Heritage Concession portion of the Marange Diamond Fields in Zimbabwe,
which is currently undergoing a study.
It also holds 100% equity in Sunland Minerals in Botswana, after
buying Russia-based miner Alrosa’s stake for a nominal sum.
Image: The Thorny River project. (Botswana Diamonds)
Botswana Diamonds to Begin Production This Year
The Bottom Line
- Botswana Diamonds will begin bulk sampling and production at Thorny River in South Africa in May, with output expected to reach 20,000 tonnes per month.
- The kimberlite ore from Thorny River will be processed at a nearby plant currently undergoing refurbishment.
- The company reported a GBP 190,000 loss in the six months ending December 31 and has not yet generated revenue.
Summary by Rapaport AI
More Stories

Qatar Diamond Exchange to Collaborate with Italian Bourse
Parties signed MoU to extend connection among their members, broaden cooperation and advance commercial relationships.

China Signs Deal to Reinvigorate Interest in Natural Diamonds
Shanghai Diamond Exchange hosts signing of Beijing Declaration, with government representatives from Botswana, Namibia and South Africa.

AI, Gen Z Are Hot Topics at AGS Conclave
This year’s edition is last to take place in September, as event returns to spring in 2027.
